Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2011 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 01/24/2011 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1 grounding electrode too small to be #6 2 nipple from meter to panel to be bonded 3 nipple from panel to sub panel to be bonded 4wires to be right size according to print 5 j box on roof to be in upright position & connector loose 6 strut to be deep strut |