Permit: T11BU01704

Parcel: 99999999A


Addresses:

9044 S HOUGHTON RD


Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Permit Number - T11BU01704

Inspection Description - GRADING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
09/23/2013 GRADING - INTERMEDIATE Approved SITE HAS BEEN STABILIZED, MAJORITY OF LANDSCAPING COMPLETED.
SOME EROSION REPAIRS HAVE BEEN MADE TO DRAINAGE WAY SLOPES.
05/22/2013 GRADING - INTERMEDIATE Continued 1) PRIOR TO FINAL APPROVAL, PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER STATING THAT SITE WORK WAS COMPLETED PER THE APPROVED PLAN.
2) PROVIDE AN AS-BUILT DRAWING FOR FINAL.
3) CULVERT STORM PIPE WAS INSTALLED.
4) SOME SIDEWALK AND CURB HAS BEEN INSTALLED.
5) MOST OF THE LANDSCAPING HAS BEEN COMPLETED.
6) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
12/06/2012 GRADING - INTERMEDIATE Continued CONTRACTOR WORKING ON UTILITY INSTALL, ALL SUBGRADES HAVE BEEN SET
11/26/2012 GRADING - INTERMEDIATE Continued NO SIGNIFICANT CONCERNS AND/OR CHANGES AT THIS TIME
10/23/2012 GRADING - INTERMEDIATE Continued 1) CONTRACTOR INSTALLED STORM DRAINAGE BASIN/CHANNEL ALONG THE SOUTH AND WEST SIDE OF THE PROJECT.
2) CONTRACTOR INSTALLED DRAINAGE WEIR'S ALONG CHANNEL TO INSLUDE BLEEDER PIPES WITH ORFICE PLATES IN THEM.
3) THERE ARE TWO 24" SRP STORM DRAIN PIPES LEADING INTO THE STORM DRAINAGE CHANNEL, I DID NOT SEE THEM INSTALLED.
4) PRIOR TO FINAL APPROVAL, I WILL NEED A CERTIFICATION FROM THE ENG OF RECORD STATING THAT ALL DRAINAGE WAYS AND STORM DRAIN PIPING WAS INSTALLED PER THE APPROVED GRADING/SITE PLAN.
5) NO NOI POSTED AT ENTRANCE TO THE SITE.
6) NO OTHER SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
08/29/2012 GRADING - INTERMEDIATE Continued 1) CONTRACTOR MOVING SOIL FROM ONE SIDE OF THE SITE TO THE OTHER - ROUGH GRADING STILL BEING ACCOMPLISHED.
2) PERIMETER SEDIMENT CONTROLS STILL APPEAR TO BE IN PLACE AND BE WORKING.

NO OTHER SIGNIFICANT CONCERNS AT THIS TIME
08/20/2012 GRADING - INTERMEDIATE Continued 1) ENSURE ALL STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
2) ENSURE ALL SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT THE CONSTRUCTION.
3) SUPLEMENTAL SEDIEMNT CONTROLS MAY NEED TO BE ADDED IF CURRENT CONTROLS FAIL.
4) SWEEP ANY TRACKING OFF OF PUBLIC ROADWAY ROUTINELY.
5) CALL FOR INSPECTION FOR ANY UNDERGROUD STORM WATER PIPE INSTALLATION.
07/31/2012 GRADING - INTERMEDIATE Continued NO CHNAGES
07/30/2012 GRADING - INTERMEDIATE Continued SILT FENCE HAS BEEN INSTALLED ALONG THE NE - NORTH SIDE OF SITE, WILL INSPECT FURTHER NEXT WEEK.
07/25/2012 GRADING - INTERMEDIATE Continued 1) INSPECTED PERIMETER OF SITE W/SUPERINTENDENT AND SAFETY DIRECTOR (BRIAN SWEENEY).
2) SOME SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE SW AND WEST PERIMETER. SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE NE CORNER OF THE SITE.
3) I RECOMMEND SEDIMENT CONTROLS BE ADDED TO THE SOUTH PERIMETER AND THAT THE BIRM INSTALLED ALONG THE NORTH/NE CORNER BE REMOVED AND SILT SOCK OR SILT FENCE BE USED AT SITE BOUNDRY IN ITS PLACE.
4) I WILL REVIEW YOUR SWPPP AND WORK WITH THE SITE SUPERINTENDENT TO ENSURE ADEQ COMPLIANCE.
07/23/2012 GRADING - INTERMEDIATE Correction Required 1) INSTALL SEDIMENT CONTROLS ALONG THE PERIMETER OF THE SITE, PER YOUR STORM WATER PLAN AND PERMIT.
2) SITE CURRENTLY IN NON-COMPLIANCE W/COT STORM WATER ORDINANCE, ADEQ, AND NPDES.

CORRECT BY 5 WORKING DAYS, NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION.