Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FINAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2014 | STORMWATER FINAL INSPECTION | Approved | ||
| 10/09/2013 | STORMWATER FINAL INSPECTION | Continued | IN THE PROCESS OF INSPECTING THE SITE FOR FINAL GRADING APPROVAL 1) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 2) PROVIDE AN AS-BUILT DRAWING 3) COMPLETE ALL SITE WORK SHOWN ON THE PLANS 4) REPAIR ANY DAMAGED STORM WATER STRUCTURES INITIALLY INSTALLED 5) COMPLETE ALL LADSCAPING 6) STABILIZE REMAINING UNDEVELOPED LOTS PER COT DEV. STD. 7) FILE A NOTICE OF TERMINATION (NOT) WITH ADEQ. |
|
| 09/23/2013 | STORMWATER FINAL INSPECTION | Partial Approval | SITE HAS BEEN STABILIZED AND LANDSCASPING HAS BEEN SUBSTANTIALLY COMPLETED. SOME EROSION DUE TO STORM WATER RUN OFF. MAJORITY HAS BEEN REPAIRED. |