Inspection History Details
Inspection Status: Approved
Inspection History: NPPO PRE PERMIT INSPECTION
Permit Number - T11BU01704
Inspection Description - NPPO PRE PERMIT INSPECTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/23/2013 | NPPO PRE PERMIT INSPECTION | Approved | REPLANTING HAS BEEN COMPLETED | |
07/10/2012 | NPPO PRE PERMIT INSPECTION | Partial Approval | 1) MET WITH SUPERVISOR (BORDERLAND CONSTRUCTION) AND DISCUSSED STORM WATER REQUIRERMENTS AND NPPO REQUIREMENTS. 2) SITE GRADING LIMITS WERE MARKED. 3) EARLY STAGES OF GRUBBING TAKING PLACE. 4) MOST PLANTS FOR NPPO HAVE BEEN MOVED TO A TEMP NURSERY 5) STILL NEED AN APPROVED SET OF GRADING, SWPPP, AND LANDSCAPE PLANS 6) NOI IS POSTED ON SITE. |
|
07/06/2012 | NPPO PRE PERMIT INSPECTION | Approved | MET WITH /DIAMOND VENTURES, AND MEMBERS REPRESENTING AAA LANDSCAPE, AND /BORDERLAND CONSTRUCTION.WE LOOKED OVER THE SITE TO SEE WHAT IS NEEDED BY THE TIME THAT THEY START TO WORK NEXT WEEK. ALL OF THE BARREL CACTUS THAT IS TO BE SAVED ON THIS SITE HAS BEEN PLACED INTO A NURSARY TILL IT IS READY TO BE PLANTED IN ITS FINAL LOCATION. GRUBBING WILL START ON MONDAY IN THE AREAS WHERE THER ARE NO TRANSPLANTED TREES. DIAMOND VENTURE WILL CONTACT JOSEPH LINVILLE TOO SEE IF THEYCAN PLACE SOME OF THE NUOS AREAS. THE PICKING AND SPIKING OF THE TREES WILLL START NEXT WEEK WHEN POSSIBLE IN ALL AREAS THAT DO NOT HAVE ANY TREES TO BE RELOCATED. | |
06/19/2012 | NPPO PRE PERMIT INSPECTION | Partial Approval | MET ON SITE WITH THE CONTRACTOR JORDAN DAVIS/ AAA LANDSCAPING, FOR THIS PROJECT AND LOOKED OVER HOW THEY HAVE COMPLETED THE PLANT INVENTORY. I HAVE NOTICED THAT SOME OF THE PLANT TAGS ARE MISSING, THEY WILL HAVE THESE REPLACED PRIOR TO PLACING THESE PLANTS INTO THE NURSERY AREA. CREWS FROM AAA WILL BE WORKING ON LAYING OUT ANY FENCE MATERIAL THAT MIGHT BE NEEDED FOR MARKING OFF THE PLANTS NOT TO BE DISTURBED. THEY WILL THEN WORK ON CLEARING THE NURSEY AREA BY FIRST REMOVING ALL OF THE PROTECTIVE PLANTS AND THEN ALL OF THE OTHER VEGETATION. NONE OF THIS WORK WILL BE DONE UNTIL AFTER THEY HAVE HAD A HYDRANT APPROVED BY THE WATER DEPARTMENT FOR THEIR ONSITE WATER. |