Inspection Status: Continued
Inspection History: GRADING - INTERMEDIATE
Permit Number - T11BU01662
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Continued
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/27/2012 | GRADING - INTERMEDIATE | Continued | NEED TO COMPLETE ALL LANDSCAPING AND PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD AND AN AS-BUILT DRAWING. NO STORM WATER CONCERNS |
|
07/27/2012 | GRADING - INTERMEDIATE | Approved | ||
07/18/2012 | GRADING - INTERMEDIATE | Continued | 1) PRIOR TO FINAL GRADING APPROVAL PROVIDE AN AS-BUILT DRAWING. 2) PROVIDE A CERTIFICATION STATEMENT FROM ENGINEER OF RECORD STATING THAT SITE WORK WAS COMPLETED PER THE APPROVED PLAN. 3) PROVIDE CLARIFICATION ON NORTH SIDE PARKING LOT. IS PARKING LOT FOR FUTURE USE OR WILL IT BE BUILT PER PLAN. 4) OK TO REMOVE MOST WADDLE ALONG PERIMETER/STABILIZE SITE AS SOON AS POSSIBLE. 5) ANY CONCERNS AND/OR PROBLEMS. |
|
07/17/2012 | GRADING - INTERMEDIATE | Continued | INSPECTED SITE AFTER SIGNIFICANT RAIN. NORTH AREA DRAIN IN COURTYARD DOES NOT DRAIN. NO OTHER CONCERNS WITH DRAINAGE AT SITE. |
|
07/16/2012 | GRADING - INTERMEDIATE | Continued | SPOKE WITH PROJECT MANAGER AND WALKED THE SITE. COMPLETION APPROX 1 MONTH OUT. MOST SITE WORK DONE, WILL RE-INSPECT NEXT WEEK. CONTRACTOR NEEDS TO STABILIZE BASIN AREA AND LANDSCAPE AREA PRIOR TO REMOVING SEDIMENT CONTROLS |
|
05/14/2012 | GRADING - INTERMEDIATE | Continued | NO CONCERNS AT THIS TIME. | |
05/07/2012 | GRADING - INTERMEDIATE | Continued | NO CONCERNS AT THIS TIME. | |
04/27/2012 | GRADING - INTERMEDIATE | Continued | PROVIVDE WATER TEST ON STORM WATER PIPING UNDER SLAB. | |
04/10/2012 | GRADING - INTERMEDIATE | Continued | WORKING ON CURBING. | |
03/26/2012 | GRADING - INTERMEDIATE | Continued | NO CONCERNS AT THIS TIME. | |
03/14/2012 | GRADING - INTERMEDIATE | Continued | GOT WITH CONTRACTOR ON SWPPP INFO. | |
03/01/2012 | GRADING - INTERMEDIATE | Continued | ROUGH GRADING WORK AT THIS TIME. | |
02/28/2012 | GRADING - INTERMEDIATE | Continued | PROVIDE SWPPP INFO AT GATE . WORKING ON GRADING AND BASINS. | |
02/23/2012 | GRADING - INTERMEDIATE | Continued | CONTRATOR NOT ON SITE. | |
02/17/2012 | GRADING - INTERMEDIATE | Continued | WORKING ON SWPPP INFO FOR GATE PRE-CON ON MONDAY. | |
02/14/2012 | GRADING - INTERMEDIATE | Continued | GOT WITH CHUCK ABOUT NOI AND WHAT HE NEEDS TO HAVE AT PRE-CON MEETING. | |
02/13/2012 | GRADING - INTERMEDIATE | Denied | GRADING HAS STARTED NO NOTES OF PRE CON MEETING. |