Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/12/2012 | FIRE SPKLR - FINAL | Approved | ||
| 03/28/2012 | FIRE SPKLR - FINAL | Denied | Need proof that a Hydro pressure test was done on piping at 200 PSI for 2 hours. Tested all pull stations - passed Tested all smokes - passed Tested matrix system - passed System is ready to be approved only when the pressure test is passed on piping |