Permit: T11BU01549

Parcel: 13506136C


Addresses:

2530 S KOLB RD


Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Permit Number - T11BU01549

Inspection Description - GRADING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
04/15/2013 GRADING - INTERMEDIATE Approved
03/15/2013 GRADING - INTERMEDIATE Continued NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME
03/14/2013 GRADING - INTERMEDIATE Continued 1) TOOK PICTURES OF VALLEY GUTTER ALONG THE FRONT OF THE BLDG BEING INSTALLED
2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
02/22/2013 GRADING - INTERMEDIATE Continued 1) INSPECTED TWO INSTALLED CATCH BASINS ALONG REAR OF BLG.
2) A MANHOLE ALONG THE SAME STORM DRAIN PIPING WAS INSTALLED BUT NOT SHOWN ON THE APPROVED PLAN
3) SUPERINTENDENT STATED HE WOULD PROVIDE A COPY OF THE SOILS TEST RESULTS FOR THE BACKFILL OF THE RETENTION TANK.
4) INFORMED CONTRACTOR OF CERTIFICATION REQUIREMENT AND AS-BUILT SUBMITTAL AT THE END OF THE PROJECT.
5) NEED TO SWEEP UP TRACKING OF SOIL OFF PARKING AREA
6) RAIN AND SNOW PREVIOUS DAY
02/19/2013 GRADING - INTERMEDIATE Continued 1) OK TO COVER 12" HDPE STORM DRAIN PIPE LATERAL FROM CATCH BASIN TO MANHOLE
2) OK TO POUR CONCRETE FOR CATCH BASIN ALONG SOUTH SIDE OF SITE
3) PROVIDE AN ACCEPTABLE SOILS TEST FOR BACKFILL OF UNDERGROUND RETENTION PIPE - PROVIDE A COPY FOR VERIFICATION
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
02/14/2013 GRADING - INTERMEDIATE Continued AN APPROVED REVISION IS ON SITE

1) DRY WELL HAS BEEN DRILLED AND INSTALLED.
2) STORM WATER RET TANK HAS BEEN PLACED AND CONSTRUCTED - PICTURES HAVE BEEN TAKEN
3) CONTRACTOR BEDDED TRENCH AND ARE BACKFILLING EXCAVATION.
02/08/2013 GRADING - INTERMEDIATE Continued 1) CONTRACTOR INSTALLING UNDERGROUND RET BASIN (96" PIPE) FOR SITE STORM WATER DRAINAGE.
2) ENSURE TRENCH FOR STORM WATER SYSTEM IS CONSTRUCTED PER YOUR APPROVED PLAN AND PIPE IS INSTALLED PER MANUFACTURER SPECS.
2' MIN BETWEEN TRENCH WALL AND PIPE
6" MIN BEDDING MATERIAL
3' COVER
3) CALL FOR INSPECTION PRIOR TO COVERING BASIN CONNECTION TO DRY WELL. PRIOR TO POURING CONCRETE FOR CATCH BASINS
4) NO STORM WATER CONCERNS
01/17/2013 GRADING - INTERMEDIATE Continued NO PROGRESS ON SITE WORK AND THE UNDERGROUND RET/DET BASIN.
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
01/09/2013 GRADING - INTERMEDIATE Continued 1) SWEEP UP SOIL MORE OFTEN OUTSIDE YOUR STABILIZED ENTRANCE/EXIT
2) CALL FOR INSPECTION PRIOR TO BACKFILLING STORM WATER PIPE AND BASIN.
3) PROVIDE APPROVAL FOR DRY WELL INSTALL FROM ADEQ
4) PROVIDE VERIFICATION OF STORM WATER SELF INSPECTIONS
5) NO OTHER CONCERNS AT THIS TIME
01/04/2013 GRADING - INTERMEDIATE Continued NO SIGNIFICANT GRADING AND/OR STORM WATER CONCERNS AT THIS TIME
12/12/2012 GRADING - INTERMEDIATE Continued GRADING PLAN HAS BEEN REVISED TO SHOW AN UNDERGROUND RET/DET BASIN ALONG THE FRONT OF THE BLDG. THIS BASIN WHEN FULL WILL PUMP INTO A 70' DRY WELL.
ENSURE THE DRY WELL IS REGISTERED WITH ADEQ

NO STORM WATER CONCERNS AT THIS TIME
12/06/2012 GRADING - INTERMEDIATE Continued CHANGE IN APPROVED PLANS, STORM WATER WILL BE RETAINED ON SITE IN A UNDERGROUD BASIN 96" X 270 '

NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
11/27/2012 GRADING - INTERMEDIATE Continued NO CONCERNS AND/OR CHANGES
10/29/2012 GRADING - INTERMEDIATE Continued 1) CONTRACTOR INSTALLING 160' OF 4" HDPE STORM DRAIN PIPE ALONG THE NORTH/NE CORNER OF THE BLDG PAD.
ELEVATIONS HAVE BEEN TAKEN BY THE CONTRACTOR OF THE PIPE AND THE PIPE HAS BEEN GRADED TO DRAIN.
2) NO SIGNIFICAT STORM WATER (SWPPP) CONCERNS AT THIS TIME
10/19/2012 GRADING - INTERMEDIATE Continued 1) WALKED SITE WITH SUPERINTENDENT. CONTRACTOR OVER EXCAVATING THE BLDG PAD.
2) PERIMETER SEDIEMNT CONTROLS ARE IN PLACE
3) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN NEEDED
4) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP AND DOCUMENT THEM
5) CALL FOR INSPE FOR ANY CONCERNS OR STORM PIPE/CATCH BASIN CONSTRUCTION
09/25/2012 GRADING - INTERMEDIATE Continued CALL BACK ABOUT ROW INFO AND REQUIREMENTS.