Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T11BU01549
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2013 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 02/22/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) INSPECTED TWO INSTALLED CATCH BASINS ALONG REAR OF BLG. 2) A MANHOLE ALONG THE SAME STORM DRAIN PIPING WAS INSTALLED BUT NOT SHOWN ON THE APPROVED PLAN 3) SUPERINTENDENT STATED HE WOULD PROVIDE A COPY OF THE SOILS TEST RESULTS FOR THE BACKFILL OF THE RETENTION TANK. 4) INFORMED CONTRACTOR OF CERTIFICATION REQUIREMENT AND AS-BUILT SUBMITTAL AT THE END OF THE PROJECT. 5) NEED TO SWEEP UP TRACKING OF SOIL OFF PARKING AREA 6) RAIN AND SNOW PREVIOUS DAY |
|
| 02/19/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) OK TO COVER 12" HDPE STORM DRAIN PIPE LATERAL FROM CATCH BASIN TO MANHOLE 2) OK TO POUR CONCRETE FOR CATCH BASIN ALONG SOUTH SIDE OF SITE 3) PROVIDE AN ACCEPTABLE SOILS TEST FOR BACKFILL OF UNDERGROUND RETENTION PIPE - PROVIDE A COPY FOR VERIFICATION 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 02/14/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) ENSURE TRENCHING SPOILS ARE KEPT ON SITE 2) SWEEP UP TRACKED SOIL OFF ADJACENT PARKING AREA 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
|
| 02/08/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) CONTRACTOR INSTALLING UNDERGROUND RET BASIN (96" PIPE) FOR SITE STORM WATER DRAINAGE. 2) ENSURE TRENCH FOR STORM WATER SYSTEM IS CONSTRUCTED PER YOUR APPROVED PLAN AND PIPE IS INSTALLED PER MANUFACTURER SPECS. 2' MIN BETWEEN TRENCH WALL AND PIPE 6" MIN BEDDING MATERIAL 3' COVER 3) CALL FOR INSPECTION PRIOR TO COVERING BASIN CONNECTION TO DRY WELL. PRIOR TO POURING CONCRETE FOR CATCH BASINS 4) NO STORM WATER CONCERNS |
|
| 01/17/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO PROGRESS ON SITE WORK AND THE UNDERGROUND RET/DET BASIN. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 01/09/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) SWEEP UP SOIL MORE OFTEN OUTSIDE YOUR STABILIZED ENTRANCE/EXIT 2) CALL FOR INSPECTION PRIOR TO BACKFILLING STORM WATER PIPE AND BASIN. 3) PROVIDE APPROVAL FOR DRY WELL INSTALL FROM ADEQ 4) PROVIDE VERIFICATION OF STORM WATER SELF INSPECTIONS 5) NO OTHER CONCERNS AT THIS TIME |
|
| 01/04/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT GRADING AND/OR STORM WATER CONCERNS AT THIS TIME | |
| 12/20/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT CONCERNS AT THIS TIME | |
| 12/06/2012 | STORMWATER FOLLOW-UP INSP | Continued | CHANGE IN APPROVED PLANS, STORM WATER WILL BE RETAINED ON SITE IN A UNDERGROUD BASIN 96" X 270 ' NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 11/27/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AND/OR CHANGES | |
| 10/29/2012 | STORMWATER FOLLOW-UP INSP | Continued | 1) CONTRACTOR INSTALLING 160' OF 4" HDPE STORM DRAIN PIPE ALONG THE NORTH/NE CORNER OF THE BLDG PAD. ELEVATIONS HAVE BEEN TAKEN BY THE CONTRACTOR OF THE PIPE AND THE PIPE HAS BEEN GRADED TO DRAIN. 2) NO SIGNIFICAT STORM WATER (SWPPP) CONCERNS AT THIS TIME |
|
| 10/19/2012 | STORMWATER FOLLOW-UP INSP | Continued | 1) WALKED SITE WITH SUPERINTENDENT. CONTRACTOR OVER EXCAVATING THE BLDG PAD. 2) PERIMETER SEDIEMNT CONTROLS ARE IN PLACE 3) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN NEEDED 4) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP AND DOCUMENT THEM 5) CALL FOR INSPE FOR ANY CONCERNS OR STORM PIPE/CATCH BASIN CONSTRUCTION |