Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2012 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) MET WITH SUPERINTENDENT AND CONTRACTORS ON SITE. DISCUSSED SWPPP REQ. AND THE APPROVED GRADING PLAN. 2) THE STORM WATER PLAN HAS BEEN IMPLEMENTED AND SEDIMENT CONTROLS ARE IN PLACE FOR THE CURRENT DEMO WORK BEING DONE. 3) THE AZPDES AUTHORIZATION NUMBER/NOI HAS BEEN POSTED. 4) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN NEEDED. 5) SWEEP UP TRACKING DAILY. 6) PERFORM AND DOCUMENT ALL STORM WATER SELF INSPECTIONS PER YOUR SWPPP. LAUREN MANKUS - ENG REVIEWER FOR THE CITY OF TUCSON. |