Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T11BU01449

Parcel: 12510003F


Addresses:

3497 E BROADWAY BL


Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Permit Number - T11BU01449

Inspection Description - GRADING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
05/02/2012 GRADING - INTERMEDIATE Approved LOOKED AT ROOF DRAINS FOR NEW BLDG. STROM PIPES WILL BE BELOW GRADE AND DAY-LIGHT AT CURB. OK TO COVER PIPE.
04/30/2012 GRADING - INTERMEDIATE Continued 1) RECIEVED A CERTIFICATION STATEMENT FROM THE ENG OF RECORD STATING THAT SITE WORK WAS SUBSTATIALLY COMPLETED PER THE APPROVED PLAN.
2) INSPECTED TRASH ENCLOSURES IN ADJACENT PARKING LOTS.
3) MAJORITY OF SITE WORK COMPLETED
4) NO SIGNIFICANT STORM WATER CONCERNS
03/12/2012 GRADING - INTERMEDIATE Continued MET WITH THE CONTRACTOR AND LOOKED OVER THE SIDEWALK FORMS FOR THE NORTH LOCATION BETWEEN TARGET AND HOME DEPOT, THIS AREA WILL BE POURED ON 3/13/2012.
03/07/2012 GRADING - INTERMEDIATE Continued WALKED THE SITE W/ THE SUPERINTENDENT
1) CONTRACTOR INSTALLING A CONNECTING SIDEWALK/WALKWAY BETWEEN TARGET AND HOME DEPOT. ENSURE ITS CONSTRUCTED PER PLAN TO INCLUDE THE HC RAMP.
2) WALKED BASIN OVERFLOW AREA DRAIN, BASIN INLET PIPE, OVER FLOW SCUPPER AND AREA DRAINS BETWEEN ROSS AND JC PENNEYS - NO INSPECTION DONE ON SUB-GRADE STORM PIPE , NEED ENG OF RECORD CERT. PRIOR TO FINAL APPROVAL.
3) NO SITE WORK YET FOR SHOE CARNIVAL.
4) NEED TO INSPECT CONSTRUCTION OF TRASH ENCLOSURE.
5) NO STORM WATER CONCERNS
01/26/2012 GRADING - INTERMEDIATE Continued MET WITH SUPERINTENDENTS ( ED/ BILL W/ BARKER MORISSEY) TO DISCUSS SITE WORK AND THE CONSTRUCTION OF THE NEW SHOE CARNIVAL.
CONTRACTOR HAS STARTED SITE WORK CONSTRUCTION ON COMMON AREAS AND ACCESS SIDE WALKS SHOWN ON THE GRADING PLAN, TO INCLUDE A RET/DET BASIN W/ AN INLET PIPE AND OUTLET SCUPPER.

SITE IS UNDER A STORM WATER PLAN/ HAVE NOT SEEN THE PLAN AND CANT SEE ANY SEDIEMNT CONTROLS INSTALLED ON SITE.
STORM DRAIN PIPIE WAS INSTALLED WITHOUT INSPECTION FROM THE CITY, THEREFORE THE ENGINEER OF RECORD MUST CERTIFY THAT IT WAS INSTALLED PER THE APPROVED PLAN.

NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.