Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T11BU01351
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/25/2013 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) MET WITH SUPERINTENDENT, PROJECT MANAGER, AND SWPPP CONTRACTOR ON SITE TO INITIATE PHASE II OF THE PROJECT. 2) INSTALL SEDIEMNT CONTROLS AT WALL OPENING, AND AROUND THE EXISTING STORM DRAIN CATCH BASIN AND ALONG THE WEST/SW SIDE OF THE SITE 3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT ON SITE 4) INSTALL A DESIGNATED CONCRETE/MATERIALS WASH OUT 5) POST A COPY OF YOUR NOI 6) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
|
02/09/2012 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) NO PRE-CON MEETING CALLED IN, SITE ALREADY UNDER CONSTRUCTION. 2) SITE WAS PERMITTED FOR AN OVERALL PROJECT OF 4.6 AC, HOWEVER ONLY A SMALL PORTION OF THAT IS BEING DEVELOPED AT THIS TIME, < 1 AC. 3) THE SITE WILL BE PHASED AND THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR WORK SHOWN ON THAT PHASE. 4) SWEEP UP TRACKED SOIL DAILY. 4) CALL FOR INSPECTION PRIOR TO PAVING |