Inspection History Details
Inspection Status: Correction Required
Inspection History: GRADING - FINAL
Permit Number - T11BU01331
Inspection Description - GRADING - FINAL
Inspection Status - Correction Required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/22/2020 | GRADING - FINAL | Correction Required | THE DRAINAGE FOR THIS SITE STILL IS NOT DRAINING DOWN PROPERLY IN THE BASINS. STILL WAITING FOR REVISED DRAWINGS FOR WORK TO BE COMPLETED TO ADDRESS THIS ISSUE | |
09/11/2014 | GRADING - FINAL | Continued | WALKED SITE WITH JASON GREEN. | |
09/10/2014 | GRADING - FINAL | Continued | Walked the site today with the grading inspector, Ron Ledonne. All 3 basins on the west side of the site are ponding water. Last major rain storm was Monday, Sep 8 which lasted all day. As of Wednesday ~36 hours later the basin still have not drained. The outlet of the stormdrains into the soutwest basin has ~70" of standing water and the basin bottom itself has ~6-8" of water. THis grading plan is still active and has not provided asbuilts or post perc test to show conformance. JG | |
11/27/2013 | GRADING - FINAL | Continued | STANDING WATER IN BASIN. | |
10/29/2013 | GRADING - FINAL | Continued | GOT WITH GC HE SAID STILL WORKING ON BASINS. | |
09/17/2013 | GRADING - FINAL | Continued | WALKED SITE WITH JASON GREEN WITH AS-BUILTS. | |
09/12/2013 | GRADING - FINAL | Continued | WALKED SITE WITH DAVE BASIN ON WEST SIDE OF SITE IS HOLDING WATER. ACCESSABLE ON EAST SIDE OF SITE NEED REPAIRS WENT OVER WITH JON THE GC. ALSO SIGN FOR VAN PARKING NEEDS TO BE ADDED IN PARKING AREA NORTH OF CLUB HOUSE. | |
09/11/2013 | GRADING - FINAL | Continued | JASON GREEN SAID HE WOULD LIKE TO WALKE SITE WITH AS-BUILTS BEFORE FINAL INSPECTION. | |
04/19/2012 | GRADING - FINAL | Prior to Final Inspectn | DO NOT PROVIDE A FINAL GRADING INSPECTION UNTIL VERIFICATION WITH THE ENG REVIEWER AND TDOT THAT THE UPSTREAM BASINS ASSOCIATED WITH THE KINO/22ND STREET OVERPASS ARE CONSTRUCTED. THIS PROJECT IS BASED ON THE COMPLETION OF THE UPSTREAM BASINS TO ALLEVIATE THE EXISTING 100-YEAR FLOODPLAIN. JG |