Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
Permit Number - T11BU01215
Inspection Description - FIRE SPKLR - UG, PIPING, HYDRO
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/17/2011 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | 200 PSI FOR 2 HOURS DONE | |
11/16/2011 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | On site at 12:40 PM contractor stated that he has had the underground system pressured up at 200 PSI for over 2 hours, we walked the property checking to make sure all valves are open to stub outs and dead ends that feed sprinkler systems. Checked gauge at 1:50 PM still at 200 PSI. Contractor will be calling in permit for final 200 test on 11/17/2011 time set for 7:30 AM. | |
11/02/2011 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | Okay to bury piping to buildings 12 - 13- 24 - 22. Still needs 200 psi test and flush. | |
10/31/2011 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | Okay to bury the follwing: Bldgs. 6-7-8 piping to stainless steel riser Bldg. 17 - 60 feet stub out no riser Bldg. 18 - 150 feet stub out no riser Still need flush and 200 PSI test for 2 hours. |
|
10/21/2011 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | OK TO BURRY BUILDINGS 1,2,3,5,23. STILL NEED PRESSURE TEST ON ALL. | |
10/20/2011 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | Okay to bury the following: Bldg #4 Bldg #9 Bldg #10 Bldg #11 Still needs 200 psi test and flush |
|
10/12/2011 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | Okay to bury stub outs for clubhouse, and buildings 1 - 2 - 3 still need 200 psi test for 2 hours and flush. |