Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2014 | GRADING - FINAL | Approved | ||
| 04/02/2014 | GRADING - FINAL | Prior to Final Inspectn | 1) PROVIDE AN AS-BUILT DRAWING SHOWING CHANGES MADE 2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 3) COMPLETE ALL SITE/LANDSCAPING WORK PER PLAN |
|
| 03/26/2014 | GRADING - FINAL | Continued | 1) PRIOR TO FINAL APPROVAL COMPLETE ALL SITE/GRADING SHOWN ON THE APPROVED GRADING PLAN. 2) PROVIDE A COPY OF YOUR ELEVATION CERT. FOR YOUR FLOOD PLAIN USE PERMIT. 3) COMPLETE ALL LANDSCAPING SHOWN ON THE APPROVED PLAN. 4) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG. OF RECORD STATING THAT ALL SITE/GRADING WAS COMPLETED PER THE APPROVED PLANS 5) PROVIDE THE LATEST APPROVED PLAN FOR FINAL INSPECTION. |
|
| 01/17/2014 | GRADING - FINAL | Continued | 1) PROVIDE A COPY OF YOUR ELEV. CERTIFICATE PRIOR TO FINAL GRADING APPROVAL 2) ENSURE PEDESTRIAN ACCESS AND EGRESS MEET ANY AND ALL DEV. STANDARDS AND ADA REQUIREMENTS THAT PERTAIN TO THIS SITE. 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 4) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION CALL FOR ANY CONCERNS AND/OR CHANGES MADE TO THE SITE/GRADING |