| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2014 | GRADING - INTERMEDIATE | Approved | ||
| 03/24/2014 | GRADING - INTERMEDIATE | Continued | NO SGINIFICANT SITE/GRADING CONCERNS ATTHIS TIME | |
| 03/13/2014 | GRADING - INTERMEDIATE | Continued | 1) ADDRESSED THE DESIGNATED PEDESTRIAN ACCESS ALONG THE EAST SIDE OF THE BLDG. RECEIVED AN UPDATED DRAWING SHOWING ELEVATIONS AND SLOPES. 2) PROVIDE APPROVAL FOR CHANGES TO THE SIZE OF THE SIDEWALK SCUPPER IN THE FAR EAST CORNER OF THE SITE 3) NEED TO RE-DIRECT STORM WATER AT CURB OPENING WHERE IT INTERSECTS WITH THE SIGN ELECTRIC CONDUIT BOX ALONG THE NORTH SIDE OF THE PARKING LOT 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 02/28/2014 | GRADING - INTERMEDIATE | Continued | CONTRACTOR POURING CONCRETE FOR HC PARKING AND FOR SIDEWALKS. ENSURE REQUIRED SLOPES AND DIMENSIONS ARE MET. | |
| 02/20/2014 | GRADING - INTERMEDIATE | Continued | 1) CONTRACTOR STILL WORKING ON UTILITY INSTALL 2) SOME CURBING IN AND SOME ROUGH GRADES SET FOR SITE WORK |
|
| 02/12/2014 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT SITE/GRADING CHANGES AND/OR CONCERNS | |
| 02/11/2014 | GRADING - INTERMEDIATE | Continued | NO CHANGES, NO CONCERNS AT THIS TIME | |
| 01/24/2014 | GRADING - INTERMEDIATE | Continued | CHECKED THE STATUS OF CONSTRUCTION NO SITE GRADING CONCERNS AND/OR CHANGES AT THIS TIME NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME |
|
| 01/17/2014 | GRADING - INTERMEDIATE | Continued | 1) PROVIDE A COPY OF YOUR ELEV. CERTIFICATE PRIOR TO FINAL GRADING APPROVAL 2) ENSURE PEDESTRIAN ACCESS AND EGRESS MEET ANY AND ALL DEV. STANDARDS AND ADA REQUIREMENTS THAT PERTAIN TO THIS SITE. 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 4) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION CALL FOR ANY CONCERNS AND/OR CHANGES MADE TO THE SITE/GRADING |
|
| 01/15/2014 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT SITE CHANGES PER APPROVED PLANS | |
| 12/31/2013 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT SITE/GRADING CHANGES | |
| 12/19/2013 | GRADING - INTERMEDIATE | Continued | CONTRACTOR WORKING ON THE BUILDING AT THIS TIME. NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME | |
| 11/27/2013 | GRADING - INTERMEDIATE | Continued | 1) INSTALL OF SEDIMENT CONTROLS - APPROVED 2) RE-ESTABLISH WADDLE ALONG EAST PERIMETER AS SOON AS TRECH IS BACKFILLED 3) ENSURE YOU SWEEP UP TRACKED SOIL ROUTINELY 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED DOCUMENTED |
|
| 10/31/2013 | GRADING - INTERMEDIATE | Continued | DEMO WORK ONLY AT THIS TIME | |
| 10/25/2013 | GRADING - INTERMEDIATE | Continued | DEMO OF EXISTING CICLE K BLDG AT THIS TIME. | |
| 03/19/2013 | GRADING - INTERMEDIATE | Continued | NO ACTIVITY ON SITE | |
| 02/22/2013 | GRADING - INTERMEDIATE | Continued | 1) NO CONTRACTOR ON SITE 2) IMPORTED SOIL HAS BEEN PLACED ON SITE 3) PRE-CON NOT SCHEDULED, WILL KEEP AN EYE ON SITE |
|
| 12/20/2012 | GRADING - INTERMEDIATE | Continued | NO ACTIVITY OR CHANGES | |
| 08/23/2012 | GRADING - INTERMEDIATE | Continued | NO WORK AT THIS TIME, WAITING FOR THE CONTRACTOR TO FINISH ALL OFF-SITE WORK SOUTH OF THIS LOCATION. |