Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2014 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 03/24/2014 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME | |
| 03/13/2014 | STORMWATER FOLLOW-UP INSP | Continued | 1) ADDRESSED THE DESIGNATED PEDESTRIAN ACCESS ALONG THE EAST SIDE OF THE BLDG. RECEIVED AN UPDATED DRAWING SHOWING ELEVATIONS AND SLOPES. 2) PROVIDE APPROVAL FOR CHANGES TO THE SIZE OF THE SIDEWALK SCUPPER IN THE FAR EAST CORNER OF THE SITE 3) NEED TO RE-DIRECT STORM WATER AT CURB OPENING WHERE IT INTERSECTS WITH THE SIGN ELECTRIC CONDUIT BOX ALONG THE NORTH SIDE OF THE PARKING LOT 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 02/28/2014 | STORMWATER FOLLOW-UP INSP | Continued | ENSURE STORM WATER CONTROLS REMAIN IN PLACE UNTIL SITE IS STABILIZED | |
| 02/20/2014 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 02/12/2014 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 02/11/2014 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME | |
| 01/24/2014 | STORMWATER FOLLOW-UP INSP | Continued | CHECKED THE STATUS OF CONSTRUCTION NO SITE GRADING CONCERNS AND/OR CHANGES AT THIS TIME NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME |
|
| 01/17/2014 | STORMWATER FOLLOW-UP INSP | Continued | 1) PROVIDE A COPY OF YOUR ELEV. CERTIFICATE PRIOR TO FINAL GRADING APPROVAL 2) ENSURE PEDESTRIAN ACCESS AND EGRESS MEET ANY AND ALL DEV. STANDARDS AND ADA REQUIREMENTS THAT PERTAIN TO THIS SITE. 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 4) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION CALL FOR ANY CONCERNS AND/OR CHANGES MADE TO THE SITE/GRADING |
|
| 01/15/2014 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 12/31/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 12/20/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) RE-INSTALL SEDIMENT CONTROLS ALONG EAST SIDE OF SITE 2) SWEEP UP TRACKED SOIL AS NEEDED 3) ENSURE STORM WATER SELF INSPECTIONS ARE ACCOMPLISHED |
|
| 12/19/2013 | STORMWATER FOLLOW-UP INSP | Continued | SEDIEMTN CONTROLS IN PLACE NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 11/27/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) INSTALL OF SEDIMENT CONTROLS - APPROVED 2) RE-ESTABLISH WADDLE ALONG EAST PERIMETER AS SOON AS TRECH IS BACKFILLED 3) ENSURE YOU SWEEP UP TRACKED SOIL ROUTINELY 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED DOCUMENTED |
|
| 11/20/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO YOUR CONSTRUCTION SITE 2) IMPLEMENT YOUR SWPPP - INSTALL SEDIMENT CONTROLS ALONG THE EAST AND WEST PERIMETERS OF THE SITE, CONTROLS MAY BE CHANGED BASED ON SITE SPECIFICS 3) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR PERMIT. 5) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAYS AS NEEDED 6) CALL FOR RE-INSPECTION FOR INSTALL APPROVAL |
|
| 08/23/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO WORK AT THIS TIME, NO CONCERNS AT THIS TIME. | |
| 08/21/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO WORK AT THIS TIME, NO STORMWATER CONCERNS AT THIS TIME. | |
| 06/29/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONSTRUCTION WORK AT THIS TIME. THE DEMO WORK HAS BEEN COMPLETED ON THE ADJACENT PROPERTY BUT HAS NOT BEEN DONE ON THE CIRCLE K STORE AT THIS TIME. |