Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T11BU01015
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/29/2013 | GRADING - INTERMEDIATE | Approved | ||
07/24/2013 | GRADING - INTERMEDIATE | Partial Approval | 1) CONTRACTOR NEEDS TO CALL IN FOR FINAL GRADING. 2) PRIOR TO FINAL GRADING APPROVAL, PROVIDE AN AS-BUILT DRAWING TO THE CITY OF TUCSON 3) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD STATING THAT ALL GRADING/SITE WORK WAS SUBSTANTIALY COMPLETED PER THE APPROVED PLANS. 4) COMPLETE ALL SITE WORK |
|
06/11/2013 | GRADING - INTERMEDIATE | Continued | NO SITE WORK AT THIS TIME | |
05/13/2013 | GRADING - INTERMEDIATE | Continued | TOOK A LOOK AT THE MAIN ENTRANCE AND PEDESTRIAN ACCESS FROM THE PARKING ARE - NO CONCERNS AT THIS TIME | |
05/02/2013 | GRADING - INTERMEDIATE | Continued | CONTRACTOR RESURFACING SECTION OF PARKING LOT ALONG THE WEST SIDE OF THE SITE, TO INLUDE NEW LANDSCAPE ISLANDS AND CURBING. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
04/19/2013 | GRADING - INTERMEDIATE | Continued | 1) NO SIGNIFICANT SITE WORK AT THIS TIME 2) NO STORM WATER CONCERNS AT THIS TIME 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
|
04/10/2013 | GRADING - INTERMEDIATE | Continued | NO SITE WORK AT THIS TIME | |
04/01/2013 | GRADING - INTERMEDIATE | Continued | 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) NO SITE WORK CONCERNS AT THIS TIME |
|
03/26/2013 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT CHANGES AND OR CONCERNS AT THIS TIME | |
03/20/2013 | GRADING - INTERMEDIATE | Continued | 1) CONTINUE TO REMOVE EQUIP AND MATERIAL FROM SEDIMENT CONTROLS 2) ENSURE SILT SOCK REMAINS IN PLACE AND IS MAINTAINED UNTIL THE SITE IS PAVED. 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 4) NO SIGNIFICANT SITE WORK AT THIS TIME |
|
03/15/2013 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT CHANGES AND OR CONCERNS AT THIS TIME | |
02/19/2013 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME ENSURE TACKED SOIL FROM CONSTRUCTION IS SWEPT UP ROUTINELY |
|
02/05/2013 | GRADING - INTERMEDIATE | Continued | 1) CONTRACTOR POURING FOOTINGS FOR BLDG FOUNDATION 2) NO STORM WATER CONCERNS AT THIS TIME |
|
01/14/2013 | GRADING - INTERMEDIATE | Continued | STORM DRAIN PIPING, MANHOLES AND BUBBLERS HAVE BEEN INSTALLED. THERE IS SUBSTANTIAL SITE WORK LEFT TO BE DON. ROCHE CONSTRUCTION IS ON SITE AND WILL START THE BLDG. NO STORM WATER CONCERNS AT THIS TIME |
|
01/09/2013 | GRADING - INTERMEDIATE | Continued | NO CHANGES, NO STORM WATER CONCERNS AT THIS TIME | |
01/04/2013 | GRADING - INTERMEDIATE | Continued | CONTINUED INSTALLATION OF STORM PIPE AND MANHOLES NO CHANGES AND/OR SIGNIFICANT CONCERNS AT THIS TIME |
|
01/02/2013 | GRADING - INTERMEDIATE | Continued | INSPECTED INSTALLATION OF PIPE AND ONE MANHOLE ALONG SW CORNER OF SITE. NO STORM WATER CONCERNS AT THIS TIME |
|
12/27/2012 | GRADING - INTERMEDIATE | Continued | NO CHANGES AND/OR CONCERNS AT THIS TIME | |
12/24/2012 | GRADING - INTERMEDIATE | Continued | FOLLOW UP INSPECTION, NO CONCERNS AT THIS TIME | |
12/19/2012 | GRADING - INTERMEDIATE | Continued | 1) CONTRACTOR INSTALLED STORM PIPE ALONG SOUTH AND WEST SIDES OF SITE, PICTURES TAKEN. TWO STORM MANHOLES INSTALLED ALSO 2) NO STORM WATER CONCERNS AT THIS TIME |
|
12/17/2012 | GRADING - INTERMEDIATE | Continued | CONTRACTOR MAKING PROGRESS ON INSTALL OF PIPE. WORKING ON TRENCH TO THE SOUTH. NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME |
|
12/14/2012 | GRADING - INTERMEDIATE | Continued | TOOK PICTURES OF 12" HDPE STORM PIPE ALONG WEST SIDE OF BLDG. MANHOLE IN PLACE - OK TO COVER NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
12/13/2012 | GRADING - INTERMEDIATE | Continued | 1) CONTRACTOR (BARKER MORRISEY - ADAM ) INSTALLING STORM PIPING ALONG PERIMETER OF BLDG FOOTPRINT. 2) SIPHONIC MANHOLES CONNECTED TO THE ROOF DRAINS OF THE BLDG WITH A BUBBLER BOX AND A RUN OF 12" HDPE IN BETWEEN. 3) BLDG PAD HAS BEEN GRADED. 4) SOME SITE WORK WILL BE DONE TO INCLUDE A PARKING AREA AND LANDSCAPE ISLANDS. 5) SWPPP REQUIREMENTS HAVE BEEN IMPLEMENTED AND WILL BE MONITORED. |