Permit: T11BU01015

Parcel: 12510003F

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T11BU01015

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
07/29/2013 STORMWATER FOLLOW-UP INSP Approved
06/11/2013 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
06/04/2013 STORMWATER FOLLOW-UP INSP Continued NO CHANGES AND/OR CONCERNS AT THIS TIME
05/13/2013 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME
05/02/2013 STORMWATER FOLLOW-UP INSP Continued CONTRACTOR RESURFACING SECTION OF PARKING LOT ALONG THE WEST SIDE OF THE SITE, TO INLUDE NEW LANDSCAPE ISLANDS AND CURBING.
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
04/19/2013 STORMWATER FOLLOW-UP INSP Continued 1) NO SIGNIFICANT SITE WORK AT THIS TIME
2) NO STORM WATER CONCERNS AT THIS TIME
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
04/10/2013 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
ENSURE YOUR STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR APPROVED PLANS
04/04/2013 STORMWATER FOLLOW-UP INSP Continued NO STORM WATER AND/OR SITE CONCERNS AT THIS TIME
04/01/2013 STORMWATER FOLLOW-UP INSP Continued 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) NO SITE WORK CONCERNS AT THIS TIME
03/26/2013 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
03/20/2013 STORMWATER FOLLOW-UP INSP Continued 1) CONTINUE TO REMOVE EQUIP AND MATERIAL FROM SEDIMENT CONTROLS
2) ENSURE SILT SOCK REMAINS IN PLACE AND IS MAINTAINED UNTIL THE SITE IS PAVED.
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
4) NO SIGNIFICANT SITE WORK AT THIS TIME
03/12/2013 STORMWATER FOLLOW-UP INSP Correction Required 1) PERIMETER SEDIMENT CONTROLS NEED TO BE MAINTAINED THROUGHOUT CONSTRUCTION.
2) RE-INSTALL, REPLACE OR REPAIR SILT SOCK ALONG WEST AND SOUTH PERIMETER.
3) REMOVE CONSTRUCTION MATERIAL OFF OF SILT SOCK.
4) OVERLAP AND STAKE-IN SILT SOCK
5) ESURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
6) CALL FOR RE-INSPECTION WHEN SEDIEMNT CONTROLS ARE REPAIRED.
02/05/2013 STORMWATER FOLLOW-UP INSP Continued 1) CONTRACTOR POURING FOOTINGS FOR BLDG FOUNDATION
2) NO STORM WATER CONCERNS AT THIS TIME
01/14/2013 STORMWATER FOLLOW-UP INSP Continued STORM DRAIN PIPING, MANHOLES AND BUBBLERS HAVE BEEN INSTALLED.
THERE IS SUBSTANTIAL SITE WORK LEFT TO BE DON.
ROCHE CONSTRUCTION IS ON SITE AND WILL START THE BLDG.
NO STORM WATER CONCERNS AT THIS TIME
01/09/2013 STORMWATER FOLLOW-UP INSP Continued NO CHANGES, NO STORM WATER CONCERNS AT THIS TIME
01/04/2013 STORMWATER FOLLOW-UP INSP Continued CONTINUED INSTALLATION OF STORM PIPE AND MANHOLES
NO CHANGES AND/OR SIGNIFICANT CONCERNS AT THIS TIME
01/02/2013 STORMWATER FOLLOW-UP INSP Continued INSPECTED INSTALLATION OF PIPE AND ONE MANHOLE ALONG SW CORNER OF SITE.
NO STORM WATER CONCERNS AT THIS TIME
12/24/2012 STORMWATER FOLLOW-UP INSP Continued FOLLOW UP INSPECTION, NO CONCERNS AT THIS TIME
12/19/2012 STORMWATER FOLLOW-UP INSP Continued 1) CONTRACTOR INSTALLED STORM PIPE ALONG SOUTH AND WEST SIDES OF SITE, PICTURES TAKEN.
TWO STORM MANHOLES INSTALLED ALSO
2) NO STORM WATER CONCERNS AT THIS TIME
12/17/2012 STORMWATER FOLLOW-UP INSP Continued CONTRACTOR MAKING PROGRESS ON INSTALL OF PIPE. WORKING ON TRENCH TO THE SOUTH.

NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME
12/14/2012 STORMWATER FOLLOW-UP INSP Continued TOOK PICTURES OF 12" HDPE STORM PIPE ALONG WEST SIDE OF BLDG.
MANHOLE IN PLACE - OK TO COVER

NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
12/13/2012 STORMWATER FOLLOW-UP INSP Continued 1) CONTRACTOR (BARKER MORRISEY - ADAM ) INSTALLING STORM PIPING ALONG PERIMETER OF BLDG FOOTPRINT.
2) SIPHONIC MANHOLES CONNECTED TO THE ROOF DRAINS OF THE BLDG WITH A BUBBLER BOX AND A RUN OF 12" HDPE IN BETWEEN.
3) BLDG PAD HAS BEEN GRADED.
4) SOME SITE WORK WILL BE DONE TO INCLUDE A PARKING AREA AND LANDSCAPE ISLANDS.