Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T11BU01015
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/29/2013 | STORMWATER FOLLOW-UP INSP | Approved | ||
06/11/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
06/04/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO CHANGES AND/OR CONCERNS AT THIS TIME | |
05/13/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME | |
05/02/2013 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR RESURFACING SECTION OF PARKING LOT ALONG THE WEST SIDE OF THE SITE, TO INLUDE NEW LANDSCAPE ISLANDS AND CURBING. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
04/19/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) NO SIGNIFICANT SITE WORK AT THIS TIME 2) NO STORM WATER CONCERNS AT THIS TIME 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
|
04/10/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME ENSURE YOUR STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR APPROVED PLANS |
|
04/04/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER AND/OR SITE CONCERNS AT THIS TIME | |
04/01/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) NO SITE WORK CONCERNS AT THIS TIME |
|
03/26/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
03/20/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) CONTINUE TO REMOVE EQUIP AND MATERIAL FROM SEDIMENT CONTROLS 2) ENSURE SILT SOCK REMAINS IN PLACE AND IS MAINTAINED UNTIL THE SITE IS PAVED. 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 4) NO SIGNIFICANT SITE WORK AT THIS TIME |
|
03/12/2013 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) PERIMETER SEDIMENT CONTROLS NEED TO BE MAINTAINED THROUGHOUT CONSTRUCTION. 2) RE-INSTALL, REPLACE OR REPAIR SILT SOCK ALONG WEST AND SOUTH PERIMETER. 3) REMOVE CONSTRUCTION MATERIAL OFF OF SILT SOCK. 4) OVERLAP AND STAKE-IN SILT SOCK 5) ESURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 6) CALL FOR RE-INSPECTION WHEN SEDIEMNT CONTROLS ARE REPAIRED. |
|
02/05/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) CONTRACTOR POURING FOOTINGS FOR BLDG FOUNDATION 2) NO STORM WATER CONCERNS AT THIS TIME |
|
01/14/2013 | STORMWATER FOLLOW-UP INSP | Continued | STORM DRAIN PIPING, MANHOLES AND BUBBLERS HAVE BEEN INSTALLED. THERE IS SUBSTANTIAL SITE WORK LEFT TO BE DON. ROCHE CONSTRUCTION IS ON SITE AND WILL START THE BLDG. NO STORM WATER CONCERNS AT THIS TIME |
|
01/09/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO CHANGES, NO STORM WATER CONCERNS AT THIS TIME | |
01/04/2013 | STORMWATER FOLLOW-UP INSP | Continued | CONTINUED INSTALLATION OF STORM PIPE AND MANHOLES NO CHANGES AND/OR SIGNIFICANT CONCERNS AT THIS TIME |
|
01/02/2013 | STORMWATER FOLLOW-UP INSP | Continued | INSPECTED INSTALLATION OF PIPE AND ONE MANHOLE ALONG SW CORNER OF SITE. NO STORM WATER CONCERNS AT THIS TIME |
|
12/24/2012 | STORMWATER FOLLOW-UP INSP | Continued | FOLLOW UP INSPECTION, NO CONCERNS AT THIS TIME | |
12/19/2012 | STORMWATER FOLLOW-UP INSP | Continued | 1) CONTRACTOR INSTALLED STORM PIPE ALONG SOUTH AND WEST SIDES OF SITE, PICTURES TAKEN. TWO STORM MANHOLES INSTALLED ALSO 2) NO STORM WATER CONCERNS AT THIS TIME |
|
12/17/2012 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR MAKING PROGRESS ON INSTALL OF PIPE. WORKING ON TRENCH TO THE SOUTH. NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME |
|
12/14/2012 | STORMWATER FOLLOW-UP INSP | Continued | TOOK PICTURES OF 12" HDPE STORM PIPE ALONG WEST SIDE OF BLDG. MANHOLE IN PLACE - OK TO COVER NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
12/13/2012 | STORMWATER FOLLOW-UP INSP | Continued | 1) CONTRACTOR (BARKER MORRISEY - ADAM ) INSTALLING STORM PIPING ALONG PERIMETER OF BLDG FOOTPRINT. 2) SIPHONIC MANHOLES CONNECTED TO THE ROOF DRAINS OF THE BLDG WITH A BUBBLER BOX AND A RUN OF 12" HDPE IN BETWEEN. 3) BLDG PAD HAS BEEN GRADED. 4) SOME SITE WORK WILL BE DONE TO INCLUDE A PARKING AREA AND LANDSCAPE ISLANDS. 5) SWPPP REQUIREMENTS HAVE BEEN IMPLEMENTED AND WILL BE MONITORED. |