Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2011 | GRADING - INTERMEDIATE | Approved | ||
| 10/04/2011 | GRADING - INTERMEDIATE | Continued | SITE IS PARTIALLY PAVED. HIGH POINT AT NORTH END RUNNING EAST TO WEST. STORM WATER SHOULD SHEET FLOW NORTH AND SOUTH INTO WATER HARVESTING AREAS AND WALL OPENINGS. SCUPPER TO BE INSTALLED AT SIDEWALK NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 09/19/2011 | GRADING - INTERMEDIATE | Continued | 1) MET WITH SUPERINTENDENT, DISCUSSED APPROVED DEVELOPMENT PLAN. 2) CONTRACTOR WILL CONSTRUCT A NEW PARING LOT WITH COVERED PARKING. 3) STORM WATER WILL BE SURFACED DRAINED INTO WATER HARVESTING AREAS AND WALL OPENINGS. 4) NO SWPP < 1 AC 5) ENSURE A CONCRETE WASH OUT IS AVAILABLE 6) ENSURE TRACK OUT IS SWEPT UP OFF OF PUBLIC ROADWAYS |