Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2011 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) MET WITH SUPERINTENDENT, DISCUSSED APPROVED DEVELOPMENT PLAN. 2) CONTRACTOR WILL CONSTRUCT A NEW PARING LOT WITH COVERED PARKING. 3) STORM WATER WILL BE SURFACED DRAINED INTO WATER HARVESTING AREAS AND WALL OPENINGS. 4) NO SWPP < 1 AC 5) ENSURE A CONCRETE WASH OUT IS AVAILABLE 6) ENSURE TRACK OUT IS SWEPT UP OFF OF PUBLIC ROADWAYS |