Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2012 | GRADING - FINAL | Approved | ||
| 05/14/2012 | GRADING - FINAL | Denied | AWAITING APPROVED AS-BUIL FOR FINAL INSPECTION | |
| 05/03/2012 | GRADING - FINAL | Continued | INSPECTION FOR AS-BUILT | |
| 04/20/2012 | GRADING - FINAL | Denied | 1) COMPLETE ALL LANDSCAPING 2) PROVIDE APPROVED PLANS THAT SHOWS WHAT WAS BUILT 3) INSTALL CONCRETE VALLEY GUTTER OR REMOVE IT FROM PLANS 4) INSTALL STRIPINT TO INCLUDE CROSSINGS AND SIGNAGE 5) INSTALL ROCK RIP RAP SCOUR PADS ALONG WEST WALL AND SHOW IT ON PLANS 6) PROVIDE ANS AS-BUILT DRAWING AND EOR CERT STATEMENT FOR THE CITY OF TUCSON |
|
| 04/09/2012 | GRADING - FINAL | Continued | SEE PREVIOUS COMEENTS AND PROVIDE ALL REQUESTED APPROVED PAPERWORK PRIOR TO RESCHEDULING ANOTHER INSPECTION. | |
| 02/22/2012 | GRADING - FINAL | Continued | SIGNIFICANT CHANGES MADE TO THE STORM WATER DRAINAGE ALONG THE NORTH SIDE OF THE SITE. A SUBGRADE DRAINAGE PIPE WAS INSTALLED THAT IS NOT SHOWN ON THE ORIGINAL CITY OF TUCSON APPROVED GRADING PLAN. PROVIDE A CITY OF TUCSON APPROVED REVISED PLAN FOR FINAL GRADING INSPECTION. |
|
| 02/22/2012 | GRADING - FINAL | Continued | 1) WALKED THE EAST SIDE OF THE SITE FRIDAY FEB 17, WITH THE CONTRACTOR, NOTED LANDSCAPE COMPLETED AREAS. 2) NEED A REVISED/ CITY OF TUCSON APPROVED LANDSCAPE PLAN TO SHOW ALL THE CHANGES MADE ON SITE FROM THE ORIGINAL PLAN. |
|
| 01/30/2012 | GRADING - FINAL | Denied | 1) CONTRACTOR INSTALLED A STORM DRAIN PIPE ALONG THE NORTH BOUNDRY OF THE SITE. COT ENGINEERING DID NOT INSPECT THE INSTALLATION, NEED A CERT FROM THE ENGINEER OF RECORD STATING THAT THE STORM PIPE WAS INSTALLED PER THE APPROVED PLAN. 2) MEASURED SLOPES OF INSTALLED SIDEWALKS AT VARIOUS LOCATIONS. SIDE WALK NEEDS REPLACE IN TWO SPOTS IN PHASE I AREA. 3) A PERIMETER WALL HAS BEEN INSTALLED, NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. 4) CONTRACTOR STILL WORKING ON PHASE I OF PROJECT AND WANTS TO OCCUPY EACH UNIT, CITY OF TUCSON BUILDING DEPT. MUST APPROVE OCCUPANCY. |
|
| 01/26/2012 | GRADING - FINAL | Denied | DENIED, COMPLETE ALL SITE WORK SHOWN ON THE APPROVED GRADING PLAN, TO INCLUDE BUT NOT NOT LIMITED TO : LANDSCAPING, ACCESS, PARKING, STORM DRAINAGE, COMMON AREAS, TRASH ENCLOSURES, HC PARKING, AS-BUILT DRAWINGS AND ANY CERTIFICATIONS REQUIRED BY THE ENGINEER OF RECORD FOR GRADING/DRAINAGE. CALL FOR RE-INSPECTION. |