Date Description Inspector Results Comments
05/31/2012 GRADING - INTERMEDIATE Approved
05/01/2012 GRADING - INTERMEDIATE Continued NO CHANGES AT THIS TIME
04/06/2012 GRADING - INTERMEDIATE Approved ALL REMAINING ITMES WILL BE ADDRESSED WITH THE FINAL GRADING INSPECTION ONCE THE PROPER PAPER WORK IS SUBMITTED AND APPROVED.
03/08/2012 GRADING - INTERMEDIATE Continued NO CHANGES AT THIS TIME
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
03/02/2012 GRADING - INTERMEDIATE Continued NO SIGNIFICANT CHANGES AND/OR CONCERNS
02/14/2012 GRADING - INTERMEDIATE Continued NO CHANGES AND OR CONCERNS AT THIS TIME
02/02/2012 GRADING - INTERMEDIATE Continued SIDE WALKS WERE REMOVED WHERE SLOPE WAS > 5% FORMS ARE SET FOR NEW SIDE WALKS.
CONCRETE FOR MAIL KIOSK BEING POURED.
01/30/2012 GRADING - INTERMEDIATE Continued 1) CONTRACTOR INSTALLED A STORM DRAIN PIPE ALONG THE NORTH BOUNDRY OF THE SITE. COT ENGINEERING DID NOT INSPECT THE INSTALLATION, NEED A CERT FROM THE ENGINEER OF RECORD STATING THAT THE STORM PIPE WAS INSTALLED PER THE APPROVED PLAN.
2) MEASURED SLOPES OF INSTALLED SIDEWALKS AT VARIOUS LOCATIONS. SIDE WALK NEEDS REPLACE IN TWO SPOTS IN PHASE I AREA.
3) A PERIMETER WALL HAS BEEN INSTALLED, NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
4) CONTRACTOR STILL WORKING ON PHASE I OF PROJECT AND WANTS TO OCCUPY EACH UNIT, CITY OF TUCSON BUILDING DEPT. MUST APPROVE OCCUPANCY.
12/07/2011 GRADING - INTERMEDIATE Correction Required CONTRACTOR WORKING ON BLDGS, MINIMAL SITE WORK BEING DONE.
SWEEP SOIL OFF OF ADJACENT PUBLIC ROADWAY.
09/16/2011 GRADING - INTERMEDIATE Continued 1) WEST PERIMETER WALL INSTALLED W/ WALL OPENINGS. WALL OPENINGS NOT PLACED AT GRADE YET.
2) AN APPROVED DEVELOPMENT PLAN IS ON SITE.
3) CONTINUE TO SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAY - USE STREET SWEEPER IF NECESSARY.
4) ENSURE STORM WATER SELF INSPECTIONDS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP.
5) ENSURE SILT FROM CONSTRUCTION IS KEPT OUT OF NEWLY INSTALLED CATCH BASIN AND STORM DRAIN.
08/23/2011 GRADING - INTERMEDIATE Continued 1) SEDIMENT CONTROLS ARE IN PLACE - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME - >0.5" RAIN ON THUR.
2) STORM DRAIN CATCH BASIN HAS BEEN POURED AND CONNECTED W/ STORM PIPE.
3) STORM PIPE TRANSITION INTO EXISTING DRAINAGE WAY CHANNEL LOCATED IN A PUBLIC EASEMENT. A TOE DOWN WAS CONSTRUCTED WITH NEW CONCRETE SLOPES - NONE OF IT SHOWN ON ANY APPROVED PLANS.
4) REPAIR BEING DONE TO PUBLIC DRAINAGE CHANNEL AT RIM - SOIL OVER EXCAVATED AND RE-CAOMPACTED.
5) FOOTER BEING POURED FOR PERIMETER WALL
6) CONCRETE WASH OUT ON SITE.

SITE STILL DOES NOT HAVE AN APPROVED GRADING PLAN
08/19/2011 GRADING - INTERMEDIATE Continued 1) STORM WATER FOLLOW UP INSPECTION, PERIMETER SEDIMENT CONTROLS ARE IN PLACE, NO SIGNIFICANT CONCERNS AT THIS TIME.
2) LOOKED AT HOLE FOR CATCH BASIN/STORM PIPE CONNECTION, VERIFIED DIMENSIONS.
3) ENSURE PERMITTING AND APPROVALS ARE OBTAINED AS REQUIRED FOR THE SITE.
08/11/2011 GRADING - INTERMEDIATE Continued CONTRACT DOES NOT HAVE A CITY APPROVED PLANS ON SITE. THE APPROVAL STAMP FOR ENGINEERING STATES "FOR ROUGH GRADING ONLY".
1) VERIFIED AND DOCUMENTED INSTALLATION OF 36" CMP SHOWN ON THE CONDITIONALLY/ROUGH GRADING ONLY PLAN.
2) MAY ASK FOR INVERT AND OUTLET ELEVATIONS TO VERIFY THE 1.2% SLOPE ON PIPE.
3) ASKED FOR COPY OF PIPE COLLAR CONNECTION CLARIFICATION FROM THE SITE ENGINEERING TO BE SENT TO ME.
08/09/2011 GRADING - INTERMEDIATE Cancelled
07/28/2011 GRADING - INTERMEDIATE Continued 1) PROVIDE CLARIFICATION FROM YOUR ENGINEER OF RECORD DETAILING HOW THE 36" CMP STORM DRAIN PIPING WILL BE CONNECTED -- NOT SHOWN ON PRELIMINARY GRADING.
2) ENSURE AN APPROVED GRADING PLAN IS ON SITE AS SOON AS APPLICABLE.
3) A BLEEDER PIPE WAS ADDED TO THE NW CORNER ON THE SITE, IN ORDER TO DRAIN STORM WATER AT A METERED RATE --PER THE ENG OF RECORDS DIRECTION.
4) SITE STORM WATER PROTECTION LOOKS GOOD - OK