Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2012 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 04/06/2012 | STORMWATER FOLLOW-UP INSP | Continued | SITE OKAY AT THIS TIME, FINAL NOT TO BE GIVEN TILL ALL OF THE STORMWATER CONTROLS ARE REMOVED AND THE NOT IS SUBMITTED. | |
| 03/08/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CHANGES AT THIS TIME NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 03/02/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS | |
| 02/22/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CHANGES AND OR CONCERNS WITH STORM WATER CONTROLS AT THIS TIME | |
| 02/14/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CHANGES AND OR CONCERNS AT THIS TIME | |
| 01/26/2012 | STORMWATER FOLLOW-UP INSP | Continued | SITE IS STILL UNDER A STORM WATER PERMIT AND WON'T BE FINALED UNTIL THE SITE IS 100% STABILIZED. | |
| 12/14/2011 | STORMWATER FOLLOW-UP INSP | Continued | RAINING YESTERDAY, NO CONTRACTOR ON SITE. THREE SIDE OF SITE HAS PERIMETER WALL. SITE NOT PAVED. SOME TRACKING | |
| 12/07/2011 | STORMWATER FOLLOW-UP INSP | Correction Required | CONTRACTOR WORKING ON BLDGS, MINIMAL SITE WORK BEING DONE. SWEEP SOIL OFF OF ADJACENT PUBLIC ROADWAY. |
|
| 08/19/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) STORM WATER FOLLOW UP INSPECTION, PERIMETER SEDIMENT CONTROLS ARE IN PLACE, NO SIGNIFICANT CONCERNS AT THIS TIME. 2) LOOKED AT HOLE FOR CATCH BASIN/STORM PIPE CONNECTION, VERIFIED DIMENSIONS. 3) ENSURE PERMITTING AND APPROVALS ARE OBTAINED AS REQUIRED FOR THE SITE. |
|
| 07/28/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) PROVIDE CLARIFICATION FROM YOUR ENGINEER OF RECORD DETAILING HOW THE 36" CMP STORM DRAIN PIPING WILL BE CONNECTED -- NOT SHOWN ON PRELIMINARY GRADING. 2) ENSURE AN APPROVED GRADING PLAN IS ON SITE AS SOON AS APPLICABLE. 3) A BLEEDER PIPE WAS ADDED TO THE NW CORNER ON THE SITE, IN ORDER TO DRAIN STORM WATER AT A METERED RATE --PER THE ENG OF RECORDS DIRECTION. 4) SITE STORM WATER PROTECTION LOOKS GOOD - OK |
|
| 07/26/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |