Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/26/2011 | STORMWATER INSTALL OF CONTROLS | Approved | ||
| 07/19/2011 | STORMWATER INSTALL OF CONTROLS | Partial Approval | THE CONTRACTOR HAS PLACED WADDLE ALONG THE EAST AND NORTHEAST SIDES OF THE SITE ADJACENT TO THE CHAINLINK FENCE. THIS AREA WILL NEED TO BE CHECKED IN THE FUTURE BY MIKE RUSSO TO ENSURE THAT IT IS PER THE APPROVED PLAN AND THAT IT IS WORKING AS DESIGNED. | |
| 07/12/2011 | STORMWATER INSTALL OF CONTROLS | Continued | 1) A "V" DITCH PERIMETER BIRM WAS INSTALLED AND WILL BE USED FOR SEDIMENT CONTROL. ENSURE BIRM IS COMPACTED AND MAINTAINED THROUGHOUT THE PROJECT. 2) ENSURE TRACK OUT PADS ARE USED AND MAINTAINED. SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS ROUTINELY. 3) INSTALL A CONCRETE/MATERIALS WASH-OUT WHEN APPLICABLE. DAVID WINDSOR CELL# 488-9791 (BFL/PREFERRED APARTMENT BUILDERS) |
|
| 07/12/2011 | STORMWATER INSTALL OF CONTROLS | Continued | 1) RESHAPE AND RECOMPACT BIRM ALONG EAST/SOUTHEAST PERIMETER. 2) INSTALL A MORE DEFINED BIRM AND SUPPLEMENTAL SEDIMENT CONTROLS ALONG THE NW CORNER OF THE SITE IN ORDER TO MINIMIZE SOIL FROM ENTERING THE EXISTING DRAINAGE CHANNEL. WILL RE-INSPECT THIS WEEK |