Permit: T11BU00870

Parcel: 11446213C

Inspection Status: Approved

Inspection History: STORMWATER INSTALL OF CONTROLS

Date Description Inspector Results Comments
07/26/2011 STORMWATER INSTALL OF CONTROLS Approved
07/19/2011 STORMWATER INSTALL OF CONTROLS Partial Approval THE CONTRACTOR HAS PLACED WADDLE ALONG THE EAST AND NORTHEAST SIDES OF THE SITE ADJACENT TO THE CHAINLINK FENCE. THIS AREA WILL NEED TO BE CHECKED IN THE FUTURE BY MIKE RUSSO TO ENSURE THAT IT IS PER THE APPROVED PLAN AND THAT IT IS WORKING AS DESIGNED.
07/12/2011 STORMWATER INSTALL OF CONTROLS Continued 1) A "V" DITCH PERIMETER BIRM WAS INSTALLED AND WILL BE USED FOR SEDIMENT CONTROL. ENSURE BIRM IS COMPACTED AND MAINTAINED THROUGHOUT THE PROJECT.
2) ENSURE TRACK OUT PADS ARE USED AND MAINTAINED. SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS ROUTINELY.
3) INSTALL A CONCRETE/MATERIALS WASH-OUT WHEN APPLICABLE.

DAVID WINDSOR CELL# 488-9791 (BFL/PREFERRED APARTMENT BUILDERS)
07/12/2011 STORMWATER INSTALL OF CONTROLS Continued 1) RESHAPE AND RECOMPACT BIRM ALONG EAST/SOUTHEAST PERIMETER.
2) INSTALL A MORE DEFINED BIRM AND SUPPLEMENTAL SEDIMENT CONTROLS ALONG THE NW CORNER OF THE SITE IN ORDER TO MINIMIZE SOIL FROM ENTERING THE EXISTING DRAINAGE CHANNEL.

WILL RE-INSPECT THIS WEEK