Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/22/2012 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 07/12/2011 | ENGINEERING PRE-CONSTRUCTION | Continued | 1) RESHAPE AND RECOMPACT BIRM ALONG EAST/SOUTHEAST PERIMETER. 2) INSTALL A MORE DEFINED BIRM AND SUPPLEMENTAL SEDIMENT CONTROLS ALONG THE NW CORNER OF THE SITE IN ORDER TO MINIMIZE SOIL FROM ENTERING THE EXISTING DRAINAGE CHANNEL. WILL RE-INSPECT THIS WEEK |
|
| 07/11/2011 | ENGINEERING PRE-CONSTRUCTION | Continued | 1) A "V" DITCH PERIMETER BIRM WAS INSTALLED AND WILL BE USED FOR SEDIMENT CONTROL. ENSURE BIRM IS COMPACTED AND MAINTAINED THROUGHOUT THE PROJECT. 2) ENSURE TRACK OUT PADS ARE USED AND MAINTAINED. SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS ROUTINELY. 3) INSTALL A CONCRETE/MATERIALS WASH-OUT WHEN APPLICABLE. DAVID WINDSOR CELL# 488-9791 (BFL/PREFERRED APARTMENT BUILDERS) |
|
| 06/30/2011 | ENGINEERING PRE-CONSTRUCTION | Cancelled | IVRS - RI canceled |