Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date |
Description |
Inspector |
Results |
Comments |
| 08/12/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Approved |
ALL STORMWATER CONTROLS IN, NOTED CHANGES WILL BE MADE TO THE DIANAMIC PLAN IN THE CONTRACTORS TRAILER. |
| 08/11/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
MET WITH WITH LLOYD CONSTRUCTION ONSITE THIS MORNING TO SEE WHAT TYPE OF DAMAGE HAS BEEN CAUSED BY YESTERDAYS RAINS. MOST OF THE SITE LOOKS OKAY AT THIS TIME, THE CONTRACTOR WILL WALK THE SITE LATER WITH THE S.W.P.P.P. CREW TO SEE WHAT NEEDS TO BE ADJUSTED. THERE IS SOME RUNOVER ALONG THE EAST SIDE OF THE SITE, ADDITIONAL CONTROLS WILL BE REPLACED AND NOTED ON THE S.W.P.P.P. PLAN AS DINAMIC CHANGES MADE TO THE SITE AND THE DATE THAT THE CHANGES WERE MADE. WILL CONTACT THE CREW ON MONDAY TO VERIFY WHAT WAS DONE SINCE WE ARE ON A FURLOUGH DAY TOMORROW. |
| 08/10/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
DROVE THROUGH THE AREA AFTER 4:30, THERE HAS BEEN RAIN IN THIS AREA THIS AFTERNOON, SOME STANDING WATRER NOTED ALONG THE EDGE OF THE ROAD INTO THE SOUTHEAST ENTRANCE INTO THE SITE. WILL MEET WITH THE CONTRACTOR TOMORROW MORNING TO DISCUSS ANY ISSUES WITH THE SITE. |
| 08/04/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
THE CONTROLS HAVE BEEN PUT IN PLACE AROUND THE SITE, THE CONTROL ACCESS POINT IS BEING MAINTAINED, AND THE INFORMATION BOARD HAS BEEN PLACED NEAR THE SOUTHWEST ENTRANCE INTO THE SITE. I WILL VARIFY WITH THE PERSONNEL THAT THEY HAVE PLACED ALL OF THE CONTROLS PRIOR TO SIGNING THIS INSPECTION OFF. THERE APPEAR TO BE NO CONCERNS AT THIS TIME. |