Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 09/19/2011 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
Met with contractor to discuss project. No SWPPP plan for site less then 1 ac, however I did instruct contractor that City Ord. would require that no track out or discharge to city MS4 system. Also discuss sidewalks and curbs, HC ramps and parking. |