Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - OH PIPING & HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2011 | FIRE SPKLR - OH PIPING & HYDRO | Approved | ||
| 09/27/2011 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | 1. Three heads relocated and two added in Area 'B' (see plans). 2. Need to adjust one head in electrical room #1080 due to lighting obstruction in Building 'C'. 3. Add one head in N/W end room in building 'C'. 4. Two heads required in closet with divider in Building 'A' room 1004. 5. 5035 passed in building 'A' and 'C'. |
|
| 08/26/2011 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Courtesy inspection on Noth/West Area 'C' section to drop hard lid (see Plans). P/A for Area 'B' (see plans). Need to relocate 3 sprinkler heads due to obstruction. Need to add 2 heads due to greater then 4 Ft obstruction. |
|
| 08/17/2011 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | 1. OH PRESSURE TEST BUILDING B ONLY. | |
| 05/12/2011 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Checked overhead piping and 200 PSI test for the mens and womens bathrooms 12 heads only, so that contractor can cover with sheet rock. |