Date Description Inspector Results Comments
08/18/2011 GRADING - INTERMEDIATE Continued INTERMEDATE GRADING LOOKS LIKE PAVING IS DONE CALL FOR INSPECTION .
08/18/2011 GRADING - INTERMEDIATE Approved
08/17/2011 GRADING - INTERMEDIATE Continued
08/16/2011 GRADING - INTERMEDIATE Continued WORKING ON GRADING FOR PAVING.
08/15/2011 GRADING - INTERMEDIATE Continued NO CHANGES FROM LAST INSPECTION.
08/11/2011 GRADING - INTERMEDIATE Continued WORKING ON BASIN AREA.
08/10/2011 GRADING - INTERMEDIATE Not ready for Inspection ALL GRADING AND PAVING STOPPED DO TO RAIN.
08/09/2011 GRADING - INTERMEDIATE Continued PAVING STARTED TODAY.
08/08/2011 GRADING - INTERMEDIATE Continued NO GRADING ACTIVITY .CALL FROM CONTRACTOR ASK FOR EARY INSPECTION MONDAY.
08/05/2011 GRADING - INTERMEDIATE Continued NO GRADING WORK TODAY.
08/04/2011 GRADING - INTERMEDIATE Continued NO GRADING WORK AT THIS TIME TO DAY SWPPP LOOK OK.
08/03/2011 GRADING - INTERMEDIATE Continued GOT WITH CONTACTER TO CALL FOR INSPECTION BEFORE BLACK TOP.
08/02/2011 GRADING - INTERMEDIATE Continued NO CONCERS AT THIS TIME.
07/28/2011 GRADING - INTERMEDIATE Continued GRADING DRIVE WAY AREA ALMOST DONE WITH DRIVE WAY.
07/27/2011 GRADING - INTERMEDIATE Continued NO CONCERNS AT THIS TIME.
07/26/2011 GRADING - INTERMEDIATE Continued CONTRACTOR NEEDS TO CHECK PINCH POINS AT ENTRACE OFF 12TH AV 24' MIN.
07/19/2011 GRADING - INTERMEDIATE Continued NO CONCERNS AT THIS TIME.
07/14/2011 GRADING - INTERMEDIATE Continued POURING CURBS ON EAST SIDE OF JOB SITE.
07/13/2011 GRADING - INTERMEDIATE Continued NO GRADING ACTIVITY AT THIS TIME.
07/11/2011 GRADING - INTERMEDIATE Continued NO CONCERS AT THIS TIME.
06/22/2011 GRADING - INTERMEDIATE Continued INSALL CURBS PER AP PLANS WENT OVER WITH CONTACTOR
06/08/2011 GRADING - INTERMEDIATE Continued GOT WITH CONTACTOR TO CLEAN UP TRASH AND AROUND WASH OUT.
05/20/2011 GRADING - INTERMEDIATE Continued TRASH ENCLOSURE INSTALLED PER AP PLAN.
05/13/2011 GRADING - INTERMEDIATE Continued WASHOUT ON SITE. NO CONCERNS AT THIS TIME.
05/02/2011 GRADING - INTERMEDIATE Continued AT PER-CON MEETING WITH MIKE. SEE MIKES NOTES 5-2-2011