Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/29/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/22/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 12/21/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 12/20/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE BONDING OF BUILDING GAS PIPING SYSTEM 2. SUPPORT + SECURE PIPING ON ROOF TO WEATHER RESISTANT BLOCKING, BLOCKING TO ADHERE TO ROOF WITH ROOFING PRODUCT, PIPE TO BE SECURE TO BLOCKING WITH WAETHER RESISTANCE SCREWS 3. MAKE PIPE THRU ROOF WEATHER TIGHT |
|
| 12/10/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) TEST NOT HOLDING PROVIDE MININUM 10 PSI TEST 2) PROVIDE TYPE B FLUE VENT FOR WATER AND EXTEND 3' ABOVE COOLER 3) LIST MAY NOT BE COMPLETE 4) PROVIDE CSA APPROVED GAS VALVE AT DRYER |