Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2010 | PLUMBING - FINAL | Approved | ||
| 12/08/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PSI DOWN TO 3, CHECK FOR LEAKS 2) PROVIDE A MINIMUM OF 10 PSI FOR INSPECTION |
|
| 12/07/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) REQUIRE 10 PSI ON A 15 PSI GAUGE 2) PROVIDE APPROVED PIPE SUPPORTS 3) SECURE PIPING FROM MOVEMENT 4) A LISTED ROOF FLASHING IS REQUIRED AT THE ? PENETRATION 5) SECURE WATER HEATER VENT CONNECTOR TO DRAFT COLLAR AND B VENT 6) PROVIDE AN OPERATIONAL RELIEF VALVE |