Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/01/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/29/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE ALL ITEMS FROM 11/24/10 INSPECTION OR YOU COULD BE CHARGED A REINSPECTION FEE AT FUTURE |
|
| 11/24/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE WEATHER RESISTANT SCREWS FOR CLAMPS ON ROOF BLOCKING 2) MATIC BLOCKS ON ROOF TO ROOF SURFACE 3) WATER HEATER TO BE CORRECTLY INSTALLED WITH ALL VENT CONNECTORS INSTALLED IN CORRECTION DIRECTION OF VENT GAS FLOW 4) PROVIDE PERMANENT CAPS AND REMOVE OF OLD GAS PIPING 5) IF YOU INSTALL A NEW WATER HEATER HAVE IT ADDED TO PERMIT 6) VENT FROM WATER HEATER/FURNACE TO BE 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF INTAKE |