Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/16/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/08/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) TEST TO HOLD MINIMUM 10 PSI FOR 15 MINUTES WITH NO LOSS OF PRESSURE |
|
| 11/05/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) MAKE CONNECTION INTO BLDG AND RETEST ENTIRE GAS SYSTEM 2) ALL TOOL MARKS, FITTINGS AND BLACK PIPE TO BE PRIMED WITH PIPE TAPE PRIMER THEN WRAPPED WITH PIPE TAPE TO 6" ABOVE GRADE |