Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2010 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/19/2010 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEST GAUGE TO HAVE MINIMUM 10 PSI AND BE IN WORKING NOT DAMAGED CONDITION AT TIME OF INSPECTION 2) VENTING FOR WATER HEATER REQUIRES APPROVED TRANSITION FITTING, INSTALLED CORRECTLY WITH APPROVED FASTENERS AT ALL VENT JOINTS. REMOVE TAPE FROM VENT CONNECTORS. COMPLETE THE PETITION OF APPEAL FORM CORRECTLY AND HAVE SIGNED BY OWNER ON SITE FOR NEXT INSPECTION. FORM IS LEFT IN FOLDER AT METER |
|
| 11/05/2010 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |