Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2010 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/08/2010 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) TEST FROM METER THRU TO HOUSE ONLY-OK TO COVER YARD 2) PROVIDE ALL CORRECTIONS LISTED AND RETEST SYSTEM |
|
| 11/02/2010 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE MININUM 12" BURIAL DEPTH 2) PROVIDE PIPE TAPE PRIMER THEN PIPE TAPE ALL UNDERGROUND TOOL MARKS AND FITTINGS 3) UNION TO BE ABOVE GRADE IN ACCESSIBLE LOCATION 4) TEST TO BE 10 PSI MINIMUM HOLDING WITH NO LOSS OF PRESSURE FOR 15 MINUTES 5) PIPE IN DITCH TO REST ON FIRM BEDDING WITH NO STRAIN ON PIPING (STRAIGHT LINE) 6) PROVIDE WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN TO DAYLIGHT (GRAVITY) 7) INSTALL APPROVED GAS SHUT OFF VALVES FOR APPLIANCES 8) PIPING TO BE ARRANGED ON FURNACE/WATER HEATER AREA TO PROVIDE REMOVAL OF BOTH APPLIANCES WITHOUT DISASSEMBLY AND BE PROPERLY SECURED 9) PROVIDE BONDING OF BLDG GAS SYSTEM 10) VENT FROM WATER HEATER TO BE PROPERLY CONNECTED TO DRAFT HOOD 11) PROVIDE PIPE FLASHING THRU ROOF 12) WATER HEATER AND FURNACE VENT TO BE EXTENDED TO 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' WITH APPROVED DBL WALL VENT PIPING AND VENT CAP |