Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2010 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) UNDERGROUND GAS PIPING TO BE FACTORY COATED IF IRON PIPE WITH PIPE TAPE PRIMER ON ALL FITTINGS AND TOOL MARKS THEN WRAPPED WITH PIPE TAPE TO ACHIEVE 40 MIL THICKNESS OF WRAP 2) ALL GAS PIPING TO BE UNDER TEST AT TIME OF INSPECTION 3) THE TEST GAUGE YOUR USING IS DAMAGED AND NOT WORKING, PROVIDE FUNCTIONAL TEST GAUGE IN 1/10 POUND INCREMENTS 4) IF FIREPLACE LOG LIGHTER IS USED IT REQUIRES AN APPROVED GAS SHUT OFF VALVE OUTSIDE THE HEARTH OF FIREPLACE IN THE SAME ROOM WITHIN 6' OF FIREPLACE 5) PROVIDE APPROVED GAS SHUT OFF VALVE AT WATER HEATER 6) PROVIDE BONDING OF BLDG GAS SYSTEM 7) REMOVE THE TAPE AT SINLGE TO DBL WALL VENT CONNECTION OF WATER HEATER AND PROVIDE APPROVED DBL WALL VENT THRU ROOF AND CEILING WITH FLASHING AND APPROVED VENT CAP FOR WATER HEATER 8) THE 1/2" PIPE FROM THE EXTERIOR GOING UNDERGROUND IS UNDER SIZED TO FEED BOTH WATER HEATER AND FURNACE 9) INSTALL A GAS PIPING SYSTEM THAT MEETS THE BTU DEMAND ON ALL APPLIANCES 10) TEMPERATURE AND PRESSURE RELIEF DRAIN PIPE TO 90 DEGREE DOWN AT EXTERIOR 11) VENT FROM FURNACE TO BE APPROVED DBL WALL TERMINATING MINIMUM 3' ABOVE COOLER INTAKE WITHIN 10' 12) LIST MAY NOT BE COMPLETE |
|
| 10/25/2010 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PLEASE SCHEDULE AN INSPECTION WHEN SOMEONE WILL BE HOME |