Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/12/2010 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) FROM METER TO BLDG OK TO COVER TO ITEM #1 2) PROVIDE CORRECT TRANSITION FROM 1/2" COOPER TO PVC. WHERE AND WHAT DOES THIS 1/2 PVC PIPING SUPPLY AND DOES IT REQUIRE BACKFLOW PROTECTION ? 3) PROVIDE VACUUM BREAKER ON REAR HOSE BIB AND PROVIDE CORRECT BACKFLOW PROTECTION FOR LANDSCAPING AT REAR. PRESSURE VACUUM BREAKER MINIMUM |