Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/28/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NO TEST, NO APPROVED PLAN ON SITE, FAILURE TO MAKE ALL COORECTIONS HAS RESULTED IN RE-INSPECTION FEE 2) FURNACE 92,000 BTU |
|
| 10/28/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) EXTERIOR PVC REQUIRES UV PROTECTION ITEMS 1 & 2 HAVE NOT BEEN COMPLETED 2) CONTINUED NR WILL RESULT IN RE-FEE 3) 1" IS CONN TO 1" MAIN AT FURNACE BRANCH |
|
| 10/19/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE GAS ISOMETRIC FOR THIS SYSTEM APPROVED BY CITY OF TUCSON. GAS IS UNDERSIZED 2) GAS PIPING TO HAVE TEST ON PIPING HOLDING PRESSURE FOR 15 MINUTES WITH NO LOSS 3) COMPLETE ALL ITEMS FROM 9/22/10 AND HAVE INSTALLATION BOOKLET ON SITE FOR THIS RINNAI WATER HEATER |
|
| 09/22/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) GAS SUPPLY IS UNDERSIZED 2) SEDIMENT TRAP SHALL BE LOCATED AFTER SOV 3) PROVIDE CONDENSATE TRAP AND TERMINATION 4) PROVIDE INSTALLATION BOOKLET |