Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/20/2010 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 09/13/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE MINIMUM 10 PSI TEST USING TEST GAUGE IN 1/10 POUND INCREMENTS 2) PROVIDE PIPE PRIMER THEN PIPE WRAP ALL TOOL MARKS AND UNDERGROUND FITTINGS 3) PROVIDE APPROVED GAS SHUT OFF VALVES AT APPLIANCES 4) PIPING TO BE ARRANGED TO BE ABLE TO REMOVE WATER HEATER/FURNACE AND BE SECURE 5) PROVIDE RIDGID NIPPLE THRU FURNACE APPLIANCE HOUSING 6) WATER HEATER T & P DRAIN TO BE GRAVITY TO DAYLIGHT AND TERMINATE 90 DEGREE DOWN AND BE RIDGID APPROVED PIPING 7) PROVIDE BONDING OF GAS SYSTEM 8) VENT TO BE SECURED TO TOP OF WATER HEATER DRAFT HOOD AND DRAFT HOOD INSTALLED CORRECTLY |