Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2010 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 09/14/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 09/09/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) SECURE GAS PIPING AT APPLIANCES 2) PROVIDE APPROVED T & P TERMINATION WITH AIR GAP 3) NOTE: DRAIN IS PLUGGED 4) SECURE WATER HEATER VENT CONNECTOR 5) PROVIDE 1" PIPING TO FURNACE/WH AND CORRECTLY SIZED FLEX TO FURNACE 6) INSTALL AN EMERGENCY SOV AT HOUSE 7) OK TO COVER YARD LINE 8) TEST WITH PROPER TEST GAUGE (15 POUNDS) |
|
| 09/08/2010 | PLUMBING - GAS PRESSURE TEST | Cancelled | IVRS - RI canceled |