Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/31/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/19/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE PIPE PRIMER THEN TAPE ALL TOOL MARKS & FITTING UNDERGROUND TO ACHIEVE C/O M/L THICKNESS OF PIPE WRAP WITH TAPE 2) WATER HEATER TEMPERTURE AND PRESSURE RELIEF TO DISCHARGE GRAVITY DRAIN, CANNOT GO DOWN THEN BACK UP 3) REMOVE TAPE THEN PROVIDE GALV. SCREWS AT ALL VENT PIPING CONNECTIONS FOR VENT PIPING CONNECTORS FOR WATER HEATER AND FURNACE 4) PROVIDE BONDING OF BLDG GAS PIPING SYSTEM |