Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROPERLY SUPPORT ROOF TOP GAS PIPING TO WATER HEATER 2) PROVIDE DETAIL FOR STRUCTUAL SUPPORT WITH CITY OF TUCSON PLAN CHECK APPROVAL, FOR ROOF MOUNTED RINNAI WATER HEATER SUPPORT STRUCTURE 3) PROVIDE A CITY APPROVED WATER ISOMETRIC FOR THIS COMBINED POTABLE WATER AND HYDRONIC WATER HEATING SYSTEM 4) THE INSTALLATION ON THIS SITE IS NOTHING LIKE THE INSTALLATION SHOWN ON THE ASPEN AIR HANDLER PIPING DIAGRAM IN THE INSTALLATION INSTRUCTIONS |