| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2018 | PLUMBING - FINAL | Approved | ||
| 05/24/2018 | PLUMBING - FINAL | Denied | TP VALVE NEEDS TO BE PLUMBED CORRECTLY AND WATER HEATER NEEDS CATCH PAN | |
| 08/03/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) RISER CORRECTION OK 2) COURTESY UNSCHEDULED INSPECTION AND CLEARANCE PROVIDED PER LEE RAY ACTING AS BLDG OFFICIAL |
|
| 08/02/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) WATER HEATER INSTALLED WITHOUT PERMITS 2) REQUIRES APPROVED T & P PIPING WITH TERMINATION INTO PAN WITH PETITION OF APPEAL FORM 3) TEST T & P FOR PROPER OPERATION 4) GAS FLEX MAY NOT BE REUSED 5) SEDIMENT TRAPS ARE REQUIRED AT WATER HEATER AND FURNACE GAS SUPPLY 6) ELECTRICAL BONDING IS REQUIRED AT METER; EXTEND GAS RISER PRIME AND WRAP ALL TOOL MARKS BELOW GRADE 7) INSTALL PROPERLY SIZED AND APPROVED FOR GAS PIPING CLAMPS 8) WAS A PERMIT OBTAINED FOR NEW MECHANICAL UNIT ? |