Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE LIST #3,5 & 1 |
|
| 07/19/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 07/16/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) HAVE NEW WATER HEATER ADDED TO PERMIT CARD 2) PROVIDE FULL SIZE VENT PIPING FROM FURNACE 3) REMOVE ALL TAPE FROM ALL VENT CONNECTIONS AND MAKE UP ALL VENT CONNECTORS CORRECTLY WITH FASTENERS 4) WATER HEATER SHUT OFF WATER VALVE TO BE BEFORE WATER FLEX TO WATER HEATER 5) PROVIDE BONDING OF BLDG GAS PIPING SYSTEM 6) VENT CAP ON ROOF TO BE INSTALLED CORECTLY |