Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T10PL01074
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/14/2012 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
12/13/2011 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) BELOW FLOOR OK, CONNECTION TO SANITARY 2) PROVIDE A FRANK PATTERN CLEANOUT COVER OVER FLOOR CLEANOUT 3) PROVIDE A SAN TEE FOR WASH/RINSE CONNECTION IN WALL |
|
09/16/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CONNECT FLOOR SINKS TO SANITARY DRAIN OR PROVIDE AN INTERCEPTOR WITH AN INTEGRAL FLOW CONTROL 2) PROVIDE APPROVED VENTING OF BOTH FIXTURES AT 3 COMP SINK 3) USE CODE APPROVED FITTINGS, CORRECTLY INSTALLED 4) FURNCO COUPLINGS ARE NOT APPROVED IN THE WALL 5) CORRECT SLOPE AND PROVIDE CLEANOUTS AT 135 DEGREE CHANGE OF DIRECTION 6) DW FS OK |
|
02/16/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE A CITY APPROVED PLAN ON SITE AT ALL TIMES 2) PROVIDE AN INSTALLATION THAT COMPLIES WITH MINIMUM CODE STANDARDS-PAY ATTENTION TO CODE SECTIONS 901.707.4 712.304.101.4.1.1.3, 708 , 905 AND 310 UPC 2006 3) FAILURE TO COMPLY WILL RESULT IN REINSPECTION FEES 4) NOTE: A 1" AIR GAP IS REQUIRED FOR INDIRECT WASTE PIPING 801 |
|
02/04/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PLAN AND PERMIT ARE TO BE ON SITE AT ALL TIMES |
|
12/17/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
12/15/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NO ACCESS AT 9:00 AM, UNABLE TO INSPECT AFTER 10:00 AM DUE TO WORK LOAD 2) PLEASE RESCHEDULE WITH A CONTACT PHONE NUMBER SO WE CAN INSPECT BETWEEN 7:30 AM-3:00 PM |
|
07/16/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE A PLAN AND PERMIT FOR NEW FLOOR SINKS 2) ALL FIXTURES REQUIRE VENTS 3) SINKS REQUIRE CLEANOUTS 4) PROVIDE A TEST ON NEW FIXTURE PIPING 5) ONLY SANITIZE COMPARTMENT OF 3 COMP SINK MAY DRAIN INDIRECTLY 6) PROVIDE APPROVED DRAINAGE FITTINGS AS REQUIRED PER CODE 7) PERM CAP ABANDON DRAIN AT DW 8) REPLACE DAMAGE CLEANOUT PLUG |