Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/13/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/09/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SEE NOTES FROM 7/8/10 INSPECTION AND COMPLY 2) ONLY 1 CLAMP PER 1 WIRE 3) INSULATION TO BE PROPERLY SEALED WITH NO VOIDS, ALL PIPING TO BE PROTECTED, OVER SIZE CLAMPS REQUIRE TO NOT CRUSH INSULATION. CORNERS TO BE MADE UP IN WORKMANSHIP TYPE MANNER |
|
| 07/08/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) REATTACH ALL GROUND WIRES WITH APPROVED CLAMPS 2) ALL PIPING EXPOSED TO FREEZING ON EXTERIOR REQUIRES INSULATION, INSULATION TO BE PROPERLY SEALED AND PAINTED TO PROTECT FROM SUN DAMAGE 3) REPLACE BIRD BOARD AND SEAL WHERE PIPING GOES INTO BLDG TO BE WEATHER AND BUG PROOF TO WATER HEATER NOTE: YOUR TEMPERATURE AND PRESSURE RELIEF VALVE ON THE WATER HEATER APPEARS TO BE DEFECTIVE AND THE DRAIN PIPING FROM IT MUST GRAVITY DRAIN DOWN TO EXTERIOR OF BLDG TERMINATING AT 90 DEGREE DOWN ON EXTERIOR |