Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) GAS CARD AT METER |
|
| 07/07/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PSI TEST NOT HOLDING 2) INSIDE HOUSE INSPECTION OK |
|
| 07/02/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) VENT CAP MISSING 2) CORRECT T & P DRAIN AT WATER HEATER, SLOPE AND HARD PIPE 3) PROVIDE APPROVED GAS VALVES WITH NEW FLEX 4) PROVIDE ELECTRICAL BONDING OF GAS SYSTEM 5) PROVIDE PRESSURE TEST ON ENTIRE SYSTEM 6) YARD PIPING OK TO COVER |