Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/22/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEST MUST HOLD 10 PSI MININUM FOR 15 MINUTES 2) PROVIDE BONDING OF BLDG GAS PIPING 3) WATER HEATER TEMPERATURE AND PRESSURE RELIEF VALVE SHALL DISCHARGE DOWN TO 6" TO 24" FROM FINISH GRADE 4) PROVIDE YELLOW TRACER WIRE FOR UNDERGROUND GAS PIPING |