Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/08/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/04/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE LIST FROM 6/3/10 FOR BACKFLOW 2) SECURE SHOWER VALVE |
|
| 06/03/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE PROPERLY INSTALLED BACKFLOW PROTECTION FOR IRRIGATION SYSTEMS ( AN AVB MAY NOT HAVE DOWN STREAM VALVES, UPC T 6-2) 2) SECURE TUBING OVER HEAD WITH SUPPORTS AS CLOSE TO 32" AS POSSIBLE 3) SECURE TUBING SO AS NOT TO RIDE ON GANG NAILSERS 4) HAS INSTALLER BEEN TRAINED TO INSTALL PED ? 5) INSULATE OR SECURE TUBING IN WALLS FOR NOISE, PEX REQUIRES 6" CLEARANCE FROM WH VENT 6) KIT ANGLE STP IS LEAKING 7) NOTE: COMPRESSION FITTINGS DO NOT USE TEF TAPE, INSTALL AS REQUIRED 8) SECURE SHOWER VALVES 9) PROVIDE 18" OF METALLIC PIPING AT ANY FUTURE SEAT CONNECTIONS (WH) |