Inspection History Details
Inspection Status: Approved
Inspection History: SITE - SEWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/05/2010 | SITE - SEWER | Approved | IVRS - Inspection :* | |
| 10/04/2010 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* | |
| 08/04/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) #1 MANHOLE VACUUM TEST OK 2) #2 MANHOLE VACUUM TEST OK 3) WAITING O PCDEQ AUTHORIZATION TO DISCHARGE AND TERMINATION OF MANHOLES AND TRACER WIRE WITH COPLETION OF WATER SYSTEM |
|
| 07/30/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) AIR TEST MANHOLE #1 TO #2 OK 2) AIR TEST MANHOLE #1 TO #3 OK |
|
| 07/22/2010 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* | |
| 07/21/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) 4" SDR TO 8' FROM BLDG |
|
| 07/20/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* | |
| 07/19/2010 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* | |
| 07/16/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) 4" VENT THRU ROOF STUB OUT OF BLDG ONLY FOR BACKWATER VALVE WATER TEST |
|
| 06/23/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) WATER TEST ON ALL 4" SDR 35 PIPING FROM BLDGS TO PRIVATE MANHOLES 2) ALL BASES POURED AND PLUGGED |
|
| 06/21/2010 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) 6" DOCTILE FROM PUBLIC MANHOLE TO PRIVATE MAN HOLES #1 & 2 WITH 6" HCS LATERAL TO BLDG 2 2) 4" SDR 35 FROM MAN HOLE #2 TO BLDG 5, WITH 4" SDR STUB EAST FROM MAN HOLE #2 3) 4" SDR FROM MAN HOLE #1 TO 40' NORTH AND 6" SDR 35 STUB TO WEST 4) TESTING AND VERIFICATION OF GRADE AT LATER DATE, WITH TRACER WIRE |